Launching of the concrete bridge "Hreljin"
Launching of concrete bridge with hydaulic system with steel barrs - Hreljin, CroatiaPlankos d.o.o. in cooperation with Enerpac have provided hydraulic system for launching the bridge "Hreljin" in the lenght of 554,85 meters. Complete hydraulic equipment have been placed within the working unit.
Plankos have been in contact with engineers and workers on site all the time. Before the launching process, Plankos has installed and checked all the equipment and educated enginers and workers to safetly opereate the system.
Launching has took place from the higher point to the lower. Therefore the system has been equiped with the slowing down cilinders.